Between 2006 and 2010 work was started on a new type of vessel for the US Navy. With the commissioning of the USS Freedom in 2008 and the USS Independence in 2010, the Littoral Combat Ship (LCS) reached operational status. Every facet of the ships and the project was unique and innovative, from the design, to mission, to contracting structure. During the design and competition phase, two ...